This approach computes the total function points (FP) value for the project, by totaling the number of external user inputs, inquiries, outputs, and master files, and then applying the following weights: inputs (4), outputs (5), inquiries (4), and master files (10). Each FP contributor can be adjusted within a range of ±35% for a specific project complexity.